LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2009 >> Outback F4-2.5L DOHC Turbo >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Variable Valve Timing Solenoid >> Service and Repair >> Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Overhaul

Oil Flow Control Solenoid Valve

DISASSEMBLY

1. Remove the 2 mounting bolts and remove the oil return cover and gasket.
2. Remove the mounting bolt and remove the oil flow control solenoid valve.






ASSEMBLY

1. Install the oil flow control solenoid valve.

Tightening torque: 8 N.m (0.8 kgf.m, 5.9 ft.lb)

2. Apply liquid gasket to the two bolts which secure the oil return cover.

Liquid gasket: THREE BOND 1324 (Part No. 004403042) or equivalent

3. Attach the oil return cover and gasket.

Tightening torque: 8 N.m (0.8 kgf.m, 5.9 ft.lb)

NOTE: Use a new gasket.