LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2009 >> Tribeca Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission 5AT >> Oil Charge Pipe >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Oil Charge Pipe: Installation

  1. Install the oil charge pipe with a new O-ring.
    NOTE: Use new bolts.

    Tightening torque: 

    38 N.m (3.9 kgf-m, 28.0 ft-lb) 

    Fig 1: Identifying Oil Charge Pipe And O-Ring
    G06342940Courtesy of SUBARU OF AMERICA, INC.
  2. Install the air intake chamber and intake boot. Ref. to INSTALLATION , Air Intake Chamber.