Check Shift Solenoid Unit
- Measure the resistance of shift solenoids.NOTE: Measurement should be performed at 20°C (68°F).
Measuring point Standard Shift solenoid A (S1) Connector terminal - Chassis ground 11 - 15 Ω Shift solenoid B (S2) Connector terminal - Chassis ground 11 - 15 Ω Shift solenoid C (S3) Connector terminal - Chassis ground 11 - 15 Ω Shift solenoid D (S4) Connector terminal - Chassis ground 11 - 15 Ω Shift solenoid E (SR) Connector terminal - Chassis ground 11 - 15 Ω - Apply battery voltage to the shift solenoid and check the operation status.CAUTION: When applying battery voltage, do not mix up the positive (+) side and the negative (-) side.
| Measuring point | Inspection conditions | Judgment standards |
|---|---|---|
| Connector terminal (+) - Chassis ground (-) |
Apply battery voltage. | Operates (with operating noise) |