LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2004 >> Vitara 2WD V6-2.5L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Relays and Modules - Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Main Relay (Computer/Fuel System): Testing and Inspection

1. Disconnect negative cable at battery.




2. Remove main relay (1) from relay box (2).




3. Check resistance between each two terminals.

If check results are as specified, proceed to next operation check. If not, replace.

Main relay resistance
Between "A" and "B": (Infinity)
Between "C" and "D": 79 - 95 Ohm at 20 °C (68 °F)




4. Check that there is continuity between terminals "A" and "B" when battery is connected to terminals "C" and "D". If malfunction is found, replace.