Transfer Assembly: Installation: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL TRANSFER ASSEMBLY
- Install the transfer assembly to the transaxle assembly with the 2 bolts and 6 nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 69 N*m (700 kgf*cm, 51 ft.*lbf)
NOTE:- Install the transfer assembly to the transaxle assembly horizontally.
- Do not touch the transfer assembly oil seals during installation.
- Install the transfer assembly to the transaxle assembly with the 2 bolts and 6 nuts.
- INSTALL AUTOMATIC TRANSAXLE ASSEMBLY . Refer to INSTALLATION - Step 8
- INSTALL TRANSFER STIFFENER PLATE RH
- Install the transfer stiffener plate RH with the 4 bolts.
Torque: 34 N*m (347 kgf*cm, 25 ft.*lbf)
Bolt length
Bolt A
45 mm (1.7717 in.)
Bolt B
30 mm (1.1811 in.)
- Install the transfer stiffener plate RH with the 4 bolts.
- INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT . Refer to INSTALLATION - Step 10
- INSTALL REAR ENGINE MOUNTING BRACKET . Refer to INSTALLATION - Step 13
- CONNECT WIRE HARNESS . Refer to INSTALLATION - Step 14
- INSTALL STARTER ASSEMBLY . Refer to INSTALLATION - Step 2
- TEMPORARILY TIGHTEN REAR ENGINE MOUNTING INSULATOR . Refer to INSTALLATION - Step 13
- INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
Refer to INSTALLATION for 2AZ-FE.