Diagnosis Procedure
WARNING: This page is about a different car, the 2011 Nissan Leaf. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK CONTINUITY OF STEERING SWITCH SIGNAL B CIRCUIT
- Turn power switch OFF.
- Disconnect AV control unit and spiral cable connectors.
- Check for continuity between AV control unit harness connector and spiral cable connector.CONTINUITY REFERENCE CHART
AV control unit Spiral cable Continuity Connector Terminal Connector Terminal M83 16 M33 31 Exists - Check for continuity between AV control unit harness connector and ground.CONTINUITY REFERENCE CHART
AV control unit Ground Continuity Connector Terminal M83 16 Does not exist Is the check result normal?
YES: GO TO 2.
NO: Repair the harnesses or connectors.
- SPIRAL CABLE INSPECTION
Check the spiral cable.
Is the check result normal?
YES: GO TO 3.
NO: Replace the spiral cable.
- CHECK AV CONTROL UNIT VOLTAGE
- Connect AV control unit and spiral cable connectors.
- Turn power switch ON.
- Check voltage between AV control unit harness connectors.VOLTAGE REFERENCE CHART
Probe Standard Reference value (+) (-) AV control unit Connector Terminal Connector Terminal M83 16 M83 15 0 - 5.5 V Approximately 5 V Is the check result normal?
YES: GO TO 4.
NO: Replace the AV control unit. "REMOVAL AND INSTALLATION ".
- CHECK STEERING SWITCH
- Turn power switch OFF.
- Check the steering switch.
"COMPONENT INSPECTION ".
Is the check result normal?
YES: INSPECTION END
NO: Replace the steering switch. "REMOVAL AND INSTALLATION ".