Installation - Upper Intake Manifold
WARNING: This page is about a different car, the 2004 Chrysler Pacifica. However, it is still accessible from the selected car via links, so may be relevant.
- Clean and inspect gasket sealing surfaces.
- Position new gasket.
- Install the throttle body on the upper intake (if required) (Refer to THROTTLE BODY ).
- Install upper intake manifold and hand start all attaching bolts.
- Tighten bolts gradually starting in the center working outward until a torque of 12 N.m (105 in. lbs.) is obtained.
- Install the front and rear intake manifold support brackets.
- Install the oil level indicater and oil fill tube to intake manifold bolts (Figure ).
- Install the EGR tube (Refer to EXHAUST GAS RECIRCULATION ).
- Connect vacuum lines to the following (Figure
):
- Positive Crankcase Ventilation (PCV) Valve
- EVAP Purge Solenoid
- Power Brake Booster
- Install alternator support bracket (Figure ).
- Connect electrical connectors to the following (Figure
):
- Manifold Tuning Valve (MTV)
- Exhaust Gas Recirculation (EGR)
- Throttle Position Sensor (TPS)
- Idle Air Control (IAC)
- Manifold Absolute Pressure (MAP)
- Install the throttle and speed control cable bracket and retaining bolts.
- Install throttle and speed control cables to bracket and throttle arm.
- Install air cleaner housing and inlet hose.
- Install the engine cover.
- Connect negative battery cable.